Skip to content

Industrial Manufacturing

Less downtime, fewer defects, leaner inventory.

Maintenance, quality, procurement and parts data put to work on the plant floor — alongside your ERP and MES, never replacing them.

Solutions

Where we put AI to work

Intelligent procurement

Demand forecasting, price prediction, order optimisation and supplier ranking.

Quadratyx QIPP

Predictive maintenance & quality

Anticipate failures and quality drift from sensor and process data.

Accounts-payable automation

POs, invoices, payments and receivables kept in sync.

Cadel

AI applications

Ten AI applications for Industrial Manufacturing

All 100 applications →
Maintenance

Predictive maintenance

Flags rising failure risk on machines so maintenance is planned.

Data needed
Machine sensor data, maintenance history

Live demo available

Quality

Visual inspection and defect detection

Inspects parts from camera images and flags defects.

Data needed
Camera images, defect labels

Operations

OEE and downtime analytics

Breaks down availability, performance and quality losses by line and cause.

Data needed
MES/PLC data, downtime logs

Procurement

Intelligent procurement

Demand and price forecasting, order optimisation and supplier ranking.

Data needed
ERP purchasing and consumption history

Procurement

Similar-parts detection

Finds duplicate and similar part records across the item master.

Data needed
Item master, stock levels

Live demo available

Forecasting

MRO materials demand estimation

Estimates demand for maintenance, repair and operations materials.

Data needed
MRO consumption history, work orders

Operations

Production scheduling

Builds feasible schedules that respect capacity and due dates.

Data needed
Orders, routings, capacity

Operations

Energy-use optimisation

Finds where and when energy is wasted across equipment and shifts.

Data needed
Meter data, production data

Documents

Accounts-payable automation

Keeps POs, invoices and payments in sync and routes exceptions to staff.

Data needed
ERP purchasing and AP data, invoices

Cadel

Agents

Conversational access to ERP data

Ask questions of ERP data in plain language.

Data needed
ERP systems

Quadratyx AskQ

We have worked with pharmaceutical, automotive, food and industrial manufacturers.

AI Tools

Assess, try and explore the tools

All AI tools →

01 · Quick assessment

Four questions. A score, three recommendations and matched evidence.

Question 1 of 4

What do you make?

02 · Live demos

Try it on synthetic sample data

Demo on synthetic sample data, not client data

Equipment failure early warning

Sample vibration and temperature trends for 28 CNC spindles over 30 days, 6 of which went on to fail. A risk index (0–100) is computed from the rise in vibration and temperature. Move the threshold to trade failures caught against false alarms.

Asset type

Failures caught

6 of 6

False alarms

0

Assets flagged

6

AssetRiskStatus
CNC-103 Spindle100Alarm
CNC-108 Spindle100Alarm
CNC-113 Spindle100Alarm
CNC-119 Spindle100Alarm
CNC-128 Spindle100Alarm
CNC-122 Spindle77Alarm
CNC-105 Spindle26Normal
CNC-109 Spindle23Normal
CNC-121 Spindle21Normal
CNC-107 Spindle20Normal
CNC-117 Spindle20Normal
CNC-112 Spindle15Normal
CNC-123 Spindle14Normal
CNC-124 Spindle14Normal
CNC-116 Spindle13Normal
CNC-118 Spindle13Normal
CNC-106 Spindle11Normal
CNC-101 Spindle10Normal
CNC-115 Spindle10Normal
CNC-110 Spindle9Normal
CNC-102 Spindle7Normal
CNC-111 Spindle6Normal
CNC-104 Spindle5Normal
CNC-126 Spindle4Normal
CNC-120 Spindle3Normal
CNC-114 Spindle0Normal
CNC-125 Spindle0Normal
CNC-127 Spindle0Normal

CNC-103 · Spindle · risk 100

Vibration (mm/s), 30 days

Bearing temperature (°C), 30 days

Demo on synthetic sample data, not client data

Duplicate-parts finder

A sample of 16 MRO item records. Abbreviations are normalised and descriptions compared; likely duplicates are grouped with a similarity score. Stock value that could be released = value of the duplicate records beyond the one you keep.

Industry

Records checked

16

Duplicate groups

6

Stock value that could be released

USD 5,180

Similarity 100%Releasable USD 1,890
  • MRO-20003 BEARING 6308-2Z DEEP GROOVEkeepUSD 1,020
  • MRO-20001 BEARING,DEEP GROOVE,6308-2ZUSD 980
  • MRO-20002 BRG DEEP GROOVE 6308 2ZUSD 910
Similarity 77%Releasable USD 1,250
  • MRO-20010 CYLINDER,PNEUMATIC,50X100keepUSD 1,300
  • MRO-20011 PNEUMATIC CYL 50 X 100USD 1,250
Similarity 90%Releasable USD 720
  • MRO-20004 END MILL,CARBIDE,10MM,4FLkeepUSD 760
  • MRO-20005 CARBIDE END MILL 10 MM 4 FLUSD 720
Similarity 74%Releasable USD 610
  • MRO-20008 COOLANT,SEMI SYNTHETIC,20LkeepUSD 650
  • MRO-20009 SEMI SYN COOLANT 20 LUSD 610
Similarity 89%Releasable USD 390
  • MRO-20006 BELT,TIMING,HTD 8M,1200keepUSD 410
  • MRO-20007 TIMING BELT HTD 8M 1200USD 390
Similarity 74%Releasable USD 320
  • MRO-20012 SENSOR,PROXIMITY,M18,PNPkeepUSD 340
  • MRO-20013 PROX SENSOR M18 PNPUSD 320
Try your own short list (max 50 rows)

One material per line, optionally followed by ; and stock value. Processed in your browser only — nothing is sent or stored.

Pick one high-friction process. We'll quantify what fixing it is worth.

Book a briefing